The Client Assumed Their Architect Was Handling CDM
The client assumed their architect was "handling CDM." No written appointment had been made. Then HSE visited. This is an anonymised account of a situation we encounter more often than we should.
Paul Scanlon
Jul 301 min read


The Principal Designer: The Most Misappointed Role
The Principal Designer is the most misappointed role in CDM 2015. Either it is not appointed at all. Or it is appointed too late. Or it is appointed to someone without the skills and influence to perform it effectively.
Paul Scanlon
Jul 301 min read


When Did You Appoint Your Principal Designer
When did you appoint your Principal Designer — at concept, or once the drawings were already done? Timing is where most client compliance gaps begin.
Paul Scanlon
Jul 301 min read


Design and Build: Who Owns Design Compliance
On a Design and Build contract, who is responsible for design compliance? Most clients get this wrong. The assumption is simple: the contractor takes the design, so the contractor takes the duty.
Paul Scanlon
Jul 301 min read


Myth: Our CDM Coordinator Is Handling It
"Our CDM Coordinator is handling it." If someone on your project team holds that title, there is something important you need to know.