The Client: The Most Misunderstood Duty Holder
Under CDM 2015, the client is not a passive commissioner. They are a duty holder. That distinction matters. It means the client cannot simply hand the project to a contractor and step back.
Paul Scanlon
Jul 301 min read


The Principal Designer: The Most Misappointed Role
The Principal Designer is the most misappointed role in CDM 2015. Either it is not appointed at all. Or it is appointed too late. Or it is appointed to someone without the skills and influence to perform it effectively.
Paul Scanlon
Jul 301 min read


The Designer: Duties Start Before Anything Reaches a Drawing
Designers have CDM 2015 duties before anything reaches a drawing. Regulation 9 requires health and safety to be an integral part of the design process.
Paul Scanlon
Jul 301 min read


Design and Build: Who Owns Design Compliance
On a Design and Build contract, who is responsible for design compliance? Most clients get this wrong. The assumption is simple: the contractor takes the design, so the contractor takes the duty.
Paul Scanlon
Jul 301 min read


The Competence Declaration: A New Client Duty
There is a new client duty under the Building Safety Act, and most clients have never heard of it. It is not enough to appoint a competent Principal Designer and Principal Contractor.
Paul Scanlon
Jul 301 min read


When the PC Is on Site the Client's CDM Duties Remain