Essential CDM 2015 Regulatory Guides UK for Construction Projects


CDM 2015 Applies to Fit-Outs and Refurbishments
Most Clients Don't Realise… You are commissioning an office fit-out. No groundworks. No structural changes. No demolition. Is CDM 2015 relevant?
Paul Scanlon
Jul 301 min read


The Client: The Most Misunderstood Duty Holder
Under CDM 2015, the client is not a passive commissioner. They are a duty holder. That distinction matters. It means the client cannot simply hand the project to a contractor and step back.
Paul Scanlon
Jul 301 min read


Appointing a CDM Consultant Does Not Discharge Your Client Duties
One of the most common questions we get asked is: "We've appointed a CDM consultant — are we covered now?" The short answer is no.
Paul Scanlon
Jul 301 min read


Using the Same Contractor Does Not Mean Competence Is Checked
You have used the same contractor for three projects. You trust them. You know their team. Under CDM 2015, that is not the same as having checked their competence for this project.
Paul Scanlon
Jul 301 min read


Myth: Pre-Construction Information Is Optional
Pre-construction information is not a nice-to-have. It is a legal duty. Many clients treat it as paperwork the contractor sorts out. The regulations say the opposite.
Paul Scanlon
Jul 301 min read


When Did You Appoint Your Principal Designer
When did you appoint your Principal Designer — at concept, or once the drawings were already done? Timing is where most client compliance gaps begin.
Paul Scanlon
Jul 301 min read


The Golden Thread Is a Client Duty
The Golden Thread is a client responsibility. Most clients think it belongs to the contractor. Under the Building Safety Act, it is the live record of building safety information across the building's life.
Paul Scanlon
Jul 301 min read


The Competence Declaration: A New Client Duty
There is a new client duty under the Building Safety Act, and most clients have never heard of it. It is not enough to appoint a competent Principal Designer and Principal Contractor.
Paul Scanlon
Jul 301 min read


No Principal Contractor Appointed: The Duties Fall to You
Don't appoint a Principal Contractor, and the role doesn't disappear. It lands on you. This is one of the least understood consequences in CDM 2015.
Paul Scanlon
Jul 301 min read


Regulation 12: The Health and Safety File
Most clients receive the Health and Safety File at handover, file it, and never think about it again. That is the mistake.
Paul Scanlon
Jul 301 min read


Planned Preventative Maintenance and CDM 2015
The client called it "planned preventative maintenance." CDM 2015 called it construction work. HSE agreed. This is an anonymised account of how scope creep created a significant compliance gap.
Paul Scanlon
Jul 301 min read


I Didn't Know I Had Any CDM Duties
"I didn't know I had any CDM duties." We hear it on almost every first call with a new client. If you commission construction work, CDM 2015 makes you a duty holder. There is no opt-out.
Paul Scanlon
Jul 301 min read


Welfare Facilities Are a Client Duty
Welfare facilities on your construction site are not just the contractor's responsibility to sort out. Ensuring adequate welfare is a client duty under Regulation 4(4) of CDM 2015.
Paul Scanlon
Jul 301 min read