top of page
CDM-Clarity-Group-logo

How long before the evidence is on the table?

An inspector asks to see your Construction Phase Plan, your inductions and your welfare checks. How long before they are on the table?

If the honest answer is "I'd have to ring the office", that is the finding.

Wouldn't it be great if you could:

— Open any CDM duty and see the evidence attached to it

— Know who signed it off, and on what date

— Do it from a phone, on site, while the inspector waits

Enforcement rarely turns on an obscure technicality. It turns on the basics: no written appointment, no pre-construction information issued, no plan reviewed before work started. Those failures are usually documented somewhere. Just not findable.

PC Site Manager holds the full Principal Contractor lifecycle as 66 tracked items, from pre-commencement through to handover. Every item carries its own documents, its responsible person, its sign-off and its date. The certificate lives on the duty it proves.

When the question comes, the answer is one tap rather than one phone call.

Could you produce your CPP and your induction records inside five minutes today?

PC Site Manager launches on Monday 7 September 2026. Get in touch and we will set it up on a live project of your own.

 
 
 

Comments


bottom of page