Free CDM 2015 checklists
One-page checklists for principal contractors, site managers and design teams. Free to download, no sign-up.
Five one-page checklists
Each one is a single page you can print, pin up or send round. They come from the questions we are asked most, and none of them asks for your email address.
The design review checklist (PDF). Ten things every design review comment should record, five questions before anyone changes a detail on site, and three habits for every new revision. It goes with Clarity Markup.
The programme checklist (PDF). Six questions before a programme is issued, five things every information need should show, and the Monday routine that keeps the programme true. It goes with Clarity Planner.
The resourcing checklist (PDF). Seven checks before Monday, four questions before you take on a new job, and three signs your resource plan has stopped telling the truth. It goes with Clarity Resource.
The roll call checklist (PDF). Six checks before the alarm ever goes, four at the gate, and three for the Christmas shutdown. It goes with Clarity Sign In.
The handover close-out checklist (PDF). Six things every snag should carry, four checks before you call a snag closed, and four before the health and safety file goes to the client. It goes with Clarity Snagging.
Is your project notifiable?
Our free F10 notification checker tells you in a minute whether a project must be notified to HSE under CDM 2015, and who has to send the F10. Nothing you enter is stored.
The HSE's guide for clients
If you are having construction work done, start with the HSE's free leaflet Need building work done? A short guide for clients on the Construction (Design and Management) Regulations 2015 (INDG411). It sets out what a client must do, in plain English.
A question about CDM 2015 that these do not answer? Ask us.