Snagging and handover checklist

What every snag should carry, and what has to reach the health and safety file before handover. Free, one page, no sign-up.

Download the free PDF

For site managers, contractors and clerks of works closing out a job. A tick on a snag list says somebody called it done. This checklist covers what a closed snag needs to show, and the changes made during snagging that the health and safety file needs to hold.

Download the free PDF (one A4 page, no sign-up), or read it below.

A. Every snag should carry

If a snag cannot show these, it cannot be proved closed later.

  1. Where it is: the room, the level, the exact spot.

  2. A photo of the defect when it was raised.

  3. Who owns it: one contractor, not "the trades".

  4. The date it was raised, and the date it is due.

  5. A photo of the finished work when it is closed.

  6. Who signed it off, and when.

B. Before you call a snag closed

  1. Somebody other than the contractor who fixed it has looked at it.

  2. The repair matches the specification, not just the colour.

  3. Any change of product or fixing made to close it is written down.

  4. The area is clean and safe to hand over.

C. Before the health and safety file goes to the client

Regulation 12 requires the principal contractor to pass the principal designer the information the file needs, and the file to go to the client at the end of the project.

  1. Changes made on site, including those made to close snags, have reached the principal designer.

  2. Products and fixings that differ from the drawings are recorded for future maintenance.

  3. Residual risks found during snagging are in the file, not only in the snag list.

  4. The signed-off snag record is kept with the handover documents.

The printable version

The same checklist on one A4 page, to print, pin up or send round. Download the free PDF.

Preview of the free handover close-out checklist (one A4 page)

Related reading

Keep it in Clarity Snagging

Clarity Snagging: raise each snag on your phone with a photo, assign it, and each contractor closes it in their own portal with a photo of the finished work; a certificate shows every snag was signed off. Seven days free, and no card needed to start.

See Clarity Snagging

More free one-page checklists are on our free checklists page.

This checklist is general information, not legal advice.